A2 motorway

“Design and construction of the A2 Warsaw – Kukuryki motorway on the section Lubelska junction – start of the Mińsk Mazowiecki bypass” within the scope of: Task A: section I from the Lubelska junction (junction not included) to the Konik junction (junction included) with a length of 5.6 km, Task B: section II from the Konik junction (junction not included) to the boundaries of the Mińsk Mazowiecki region with a length of about 9 km.

Intermodal terminal

Construction of an intermodal terminal intended for container handling in road-rail or rail-road relations, container storage and service activities necessary for the operation of container intermodal transport.

Parking at the Port of Gdansk

Design, subgrade consolidation, paving of the buffer parking lot for trucks in Śnieżna Street. Convincing the investor to change the originally planned construction formula to Rolltec™ rolled concrete technology. Investment area: 11,300 sq m, duration: September – December 2018.

References

Here are reference letters of the companies with which we had the pleasure to cooperate. We are glad that they appreciated the competencies, technological capabilities and commitment of the LH Engineering team.